For a single room or a bathroom remodel, choose a 15 yard. For a garage cleanout, kitchen remodel, or flooring job, choose a 20 yard. For a whole-home renovation or a large cleanout, choose a 30 or 40 yard. For concrete, brick, or dirt, use a dedicated heavy container regardless of volume.
Picking a dumpster size is really two questions wearing one coat. Will the debris physically fit, and will it stay inside the weight allowance. Most people only think about the first one, and the second is what costs them money.
This guide answers both for every common Jacksonville project, using real dimensions, real weight allowances, and real prices.
Quick answer by project type
If you want the recommendation without the reasoning, find your project here.
| Project | Size | Price |
|---|---|---|
| Single room cleanout, small bathroom remodel | 15 yard | $395 |
| Garage or attic cleanout, small deck removal | 15 or 20 yard | $395 to $470 |
| Kitchen remodel, flooring replacement, moving cleanout | 20 yard | $470 |
| Whole-home declutter, large landscaping, storm debris | 30 yard | $515 |
| Whole-home renovation, estate cleanout, roof tear-off | 40 yard | $620 |
| Concrete, brick, block, dirt, any volume | 10 or 20 yard heavy | $350 to $395 |
Every size, side by side
Six containers, each with a 14-day rental, delivery, and pickup included in the price.
| Size | Dimensions | Weight included | Price |
|---|---|---|---|
| 10 yard, concrete and dirt | 17 x 7.5 x 3 ft | Unlimited | $350 |
| 15 yard | 17 x 7.5 x 4.5 ft | 1 ton | $395 |
| 20 yard, concrete and dirt | 18 x 7.5 x 5.5 ft | Unlimited | $395 |
| 20 yard | 18 x 7.5 x 5.5 ft | 2 tons | $470 |
| 30 yard | 18 x 7.5 x 7.5 ft | 3 tons | $515 |
| 40 yard | 22 x 7.5 x 5.5 ft | 4 tons | $620 |
One detail worth noticing. The 30 yard is taller than the 20 yard rather than longer, and the 40 yard is longer rather than taller. If you are working out of a truck bed or tossing debris over the side by hand, height matters more than capacity. The 40 yard is easier to load by hand than the 30 yard despite holding more, which is why it suits renovation work.
How to estimate your volume
Cubic yards mean nothing to most people. Pickup truck loads do.
A full-size pickup bed holds roughly 2.5 cubic yards when loaded level to the rails. That gives you a conversion you can actually picture.
Walk the project and count how many truckloads you think you have. Then add one. Almost everyone underestimates, because debris never stacks as neatly in the container as it does in your head, and projects always uncover more than expected once walls open up.
When weight matters more than volume
Every container except the two heavy-material units includes a weight allowance. Beyond it, overage runs $65 per ton.
For most household debris this never comes up. Furniture, clothing, boxes, and general clutter are bulky and light, so you run out of room long before you run out of weight allowance.
Dense material flips it. Roofing, tile, plaster, wet yard waste, and anything masonry can hit the allowance while the container still looks half empty.
If you can lift a five gallon bucket of it comfortably, volume is your constraint and you should size by cubic yards. If you cannot, weight is your constraint and you should size by tonnage. Roofing has its own math, covered in our roof tear-off sizing guide.
Concrete, dirt, and other heavy material
Concrete weighs roughly 4,000 pounds per cubic yard. Three cubic yards of it exceeds the entire allowance on a 30 yard container, and three cubic yards is a small patio.
That is why two containers exist specifically for heavy material, both with no weight limit at all. The 10 yard at $350 and the 20 yard at $395 handle concrete, brick, block, asphalt, dirt, and rock. Our guide to concrete and dirt disposal covers the weight math in full.
These loads have to stay clean. Concrete and masonry only, with no wood, drywall, or general trash mixed in. A contaminated load is processed as mixed debris instead, which changes both the handling and the price.
If your project produces both kinds of waste, a demolition with a concrete slab and framing lumber for instance, order two containers. It sounds like more money and usually is not, because the alternative is a large overage on a single mixed load.
Five sizing mistakes that cost money
- Sizing down to save money. The gap between a 20 yard and a 30 yard is $45. An overage charge or a second delivery costs more than that. When you are genuinely between two sizes, the larger one is the cheaper decision more often than not.
- Forgetting the weight allowance exists. A container is not just a volume. It is a volume and a tonnage, and the tonnage is what generates surprise charges.
- Mixing heavy material into a standard container. The single most expensive mistake on this list, and the easiest to avoid.
- Not breaking things down. An intact sofa or a stack of unflattened boxes wastes enormous space. Disassembly before loading can be the difference between one container and two.
- Loading above the fill line. Containers cannot be transported with debris above the rails. An overfilled container has to be leveled before it can be picked up, which delays your job.
There are a few more worth knowing about, collected in our guide to the dumpster rental mistakes that actually cost money.
Will it fit on your property
Every container needs roughly 60 feet of straight clearance for the truck to set and retrieve it, plus about 23 feet of vertical clearance for the hoist. That second number surprises people, and low branches are the usual culprit in older Jacksonville neighborhoods.
On width, plan for about 10 feet to allow the truck to maneuver, even though the containers themselves are 7.5 feet wide.
A standard two-car driveway accommodates any size we carry. Lay plywood under the rails if your driveway is pavers or newer concrete, which spreads the load and prevents marking.
If placement is tight, call and describe the site before booking. Our permit and placement guide covers right-of-way rules and the HOA restrictions people forget.
Knowing the size is half of it. Our guide to what can and cannot go in a dumpster covers the restricted items that surface on almost every project, and the full cost breakdown explains what the price includes.
Frequently asked questions
What size dumpster do I need for a garage cleanout?
A 15 yard handles most single-car garage cleanouts, and a 20 yard is the safer choice for a two-car garage or a garage that has been accumulating for years. Household clutter is bulky and light, so volume runs out long before the weight allowance does. Break down shelving and boxes to use the space efficiently.
What size dumpster do I need for a kitchen remodel?
A 20 yard container suits most kitchen remodels. Cabinets, countertops, flooring, drywall, and appliances from a standard kitchen typically fall within 20 cubic yards and 2 tons. If the remodel includes tile floors or a stone countertop, consider the 30 yard, since both are dense enough to affect the weight allowance.
How many pickup truck loads fit in a 20 yard dumpster?
Roughly 8 full-size pickup loads. A standard pickup bed holds about 2.5 cubic yards loaded level to the rails, so a 20 yard container equals about 8 loads, a 15 yard about 6, a 30 yard about 12, and a 40 yard about 16. Counting truckloads is the easiest way to estimate a cleanout.
Is it better to get a bigger dumpster than I need?
Usually yes. The price gap between adjacent sizes is small, $45 between a 20 yard and a 30 yard for example, and the larger container includes an extra ton of weight allowance. Running out of room means a second delivery, which costs far more than sizing up once. When genuinely undecided, take the larger size.
How much space do I need for a roll-off dumpster?
Plan for about 60 feet of straight clearance for the truck, roughly 10 feet of width, and around 23 feet of vertical clearance for the hoist arm. A standard two-car driveway fits any size. Low tree branches and overhead lines are the most common obstacles in older Jacksonville neighborhoods.
Can I put concrete in a regular dumpster?
Concrete should go in a dedicated concrete and dirt container instead. At roughly 4,000 pounds per cubic yard, concrete exceeds a standard container’s weight allowance almost immediately. The 10 yard concrete and dirt container at $350 and the 20 yard at $395 both carry no weight limit, provided the load stays free of wood, drywall, and general trash.