Kitchen Remodel Dumpster Size and Cost | Jacksonville, FL

Serving Jacksonville, Florida
& Surrounding Regions

📞
Call or Text (904)-605-1600

Kitchen Remodel Debris: How Much You Will Actually Generate

Short answer

A 20 yard container handles most full kitchen remodels, at $470 with 2 tons included. Move up to a 30 yard if you are pulling up tile flooring, removing stone countertops, or gutting to the studs. A cosmetic refresh with cabinets and appliances only fits a 15 yard.

Kitchens produce more debris than people expect and more weight than they plan for. The cabinets are the part everyone pictures. The tile floor underneath them is the part that generates the overage charge.

Here is what actually comes out of a kitchen, roughly what it weighs, and how to size for it.

What a kitchen remodel actually produces

Walk the room and inventory it before you book. A typical full remodel on a 150 to 200 square foot kitchen generates most of this list.

Typical kitchen debris, mid-size remodel
Component Rough volume Weight concern
Upper and lower cabinets 4 to 6 cubic yards Low, bulky
Countertops Under 1 cubic yard High if stone
Flooring and underlayment 2 to 4 cubic yards High if tile
Drywall and backsplash 2 to 3 cubic yards Moderate
Appliances 2 to 3 cubic yards Moderate
Trim, doors, packaging 2 to 3 cubic yards Low

Estimates for planning. Volume varies with kitchen size and how thoroughly things get broken down.

That adds to roughly 12 to 20 cubic yards, which is why the 20 yard is the default recommendation. The question is whether your weight lands under 2 tons.

Size by scope of work

Scope matters more than square footage. The same kitchen produces wildly different loads depending on how deep the work goes.

Container by remodel scope
Scope What comes out Container Price
Cosmetic refresh Cabinets, counters, appliances, no flooring 15 yard $395
Standard full remodel Everything above plus flooring and drywall 20 yard $470
Remodel with tile or stone Full remodel plus tile floor or stone counters 30 yard $515
Gut to studs, wall removal Everything, plus framing and plaster 30 or 40 yard $515 to $620

Every price includes a 14-day rental, delivery, and pickup. Our general sizing guide covers projects beyond the kitchen.

Three materials that blow the weight allowance

A 20 yard container includes 2 tons. Cabinets, drywall, and appliances rarely threaten that. These three do.

1. Tile flooring

Ceramic and porcelain tile with the mortar bed underneath runs roughly 4 to 5 pounds per square foot. A 200 square foot kitchen floor is therefore somewhere around 800 to 1,000 pounds, or half a ton, before anything else goes in the container.

If the tile was installed over a mud bed rather than backer board, which is common in older Jacksonville homes, that figure climbs substantially.

2. Stone countertops

Granite and quartz at standard 3 centimeter thickness run roughly 18 to 20 pounds per square foot. A typical kitchen with 40 square feet of counter is carrying around 750 pounds of stone in a volume you could fit under a table.

3. Plaster and lath

In pre-war homes, what looks like drywall is often plaster over wood lath, and it weighs considerably more. If your walls sound solid rather than hollow, plan for extra tonnage.

The combination to watch

Tile floor plus stone counters in one remodel is roughly 1,750 pounds before you add a single cabinet. That is most of a 2-ton allowance. This is the single most common reason a kitchen remodel ends with an overage charge, and stepping up to the 30 yard costs $45 to avoid it. The cost breakdown explains how overage is calculated.

Appliances need their own plan

Most kitchen appliances go straight in the container. Ranges, dishwashers, microwaves, and wall ovens are all accepted with no special handling.

The refrigerator is the exception. Refrigerators contain refrigerant that has to be professionally recovered before disposal, and the same applies to any wine fridge or ice maker coming out. Once a technician has evacuated and tagged the unit, it goes in like anything else.

Plan for this early. Discovering it on demo day means the fridge sits in your garage for a week. Our guide to what can and cannot go in a dumpster covers the full list of restricted items, including the paint and solvents that tend to surface during a kitchen project.

When to have the container on site

The 14-day window maps well onto a kitchen remodel if you place it correctly.

  1. Schedule delivery the day before demo, not the morning of. A crew standing around waiting for a truck is the most expensive hour of the project.
  2. Book before 10 AM for same-day delivery if your timeline moves up unexpectedly.
  3. Demo generates 80 percent of the volume in the first two days. Load heavy and flat early rather than tossing everything in loosely.
  4. Keep the last third of the container for installation waste. Cardboard, packaging, cabinet crating, and offcuts add up more than people expect.
  5. Call for early pickup when you are done. It costs nothing and gets the driveway back.
  6. Going past 14 days costs $20 per day, so if the project is running long, an extension is usually cheaper than rushing.

Placement matters too. A kitchen remodel means a lot of trips between the house and the container, so put it as close to the exit door as clearance allows. Our placement and permit guide covers the clearance requirements and the HOA rules people forget.

A real cost example

A 180 square foot Jacksonville kitchen, full remodel, ceramic tile floor and granite counters coming out.

$47020 yard, likely 0.5 to 1 ton over
$51530 yard, comfortably inside

In the 20 yard, the tile and stone alone put you near the 2 ton line, and the cabinets, drywall, and appliances push you past it. One ton over adds $65, bringing the total to $535.

The 30 yard at $515 is the cheaper outcome, and it is cheaper before you account for the extra ton of headroom and the risk of a second container if the volume runs over.

That is the pattern across most of this work. When you are genuinely between two sizes on a remodel, the larger one usually wins on price as well as on stress.

Demolishing more than the kitchen

If the project includes removing a concrete slab, a hearth, or brickwork, that material needs a separate container. Our guide to concrete and dirt disposal explains why mixing it into a standard container is the most expensive mistake in the business.

Frequently asked questions

What size dumpster do I need for a kitchen remodel?

A 20 yard container at $470 handles most full kitchen remodels, including cabinets, countertops, flooring, drywall, and appliances. Step up to a 30 yard at $515 if you are removing tile flooring or stone countertops, since both are dense enough to consume the 2-ton allowance on their own. A cosmetic refresh without flooring fits a 15 yard.

How much debris does a kitchen remodel produce?

A full remodel on a 150 to 200 square foot kitchen typically produces 12 to 20 cubic yards. Cabinets account for 4 to 6 cubic yards, flooring 2 to 4, drywall and backsplash 2 to 3, appliances 2 to 3, and trim and packaging another 2 to 3. Volume varies with how thoroughly components are broken down before loading.

Can I put granite countertops in a dumpster?

Yes, stone countertops are accepted in a standard container. The issue is weight rather than permission. Granite and quartz at 3 centimeter thickness run roughly 18 to 20 pounds per square foot, so 40 square feet of counter is around 750 pounds. Combined with tile flooring, stone counters are the most common cause of an overage charge on a kitchen job.

Can I throw my old refrigerator in the dumpster?

Not until the refrigerant has been professionally recovered. Refrigerators, wine fridges, and ice makers all contain refrigerant that a qualified technician must remove and tag before disposal. Ranges, dishwashers, microwaves, and wall ovens have no such requirement and go straight in. Arrange refrigerant recovery before demo day rather than during it.

How long do I need a dumpster for a kitchen remodel?

The standard 14-day rental covers most kitchen remodels. Demolition produces roughly 80 percent of the volume in the first two days, and the remainder accumulates through installation as packaging and offcuts. Additional days are $20 each, and early pickup is free if you finish ahead of schedule.

How much does a kitchen remodel dumpster cost in Jacksonville?

A 15 yard is $395, a 20 yard is $470, and a 30 yard is $515, each including a 14-day rental, delivery, and pickup with no separate fees. Weight beyond the included allowance is $65 per ton. For a remodel with tile flooring and stone countertops, the 30 yard is frequently cheaper than a 20 yard plus overage.

Need a Dumpster for Your Project?

14-day rental period, transparent flat-rate pricing, and same-day or next-day delivery across the Jacksonville area.

Keep Reading

More Tips & Resources

All Tips & Resources